A 6.9km deep tunnel intercepting combined sewer overflows, protecting the River Thames from 16 million tonnes of annual pollution.
The eastern section of London's super sewer, Tideway East, comprises a 7.2m internal diameter tunnel constructed at depths of 35-65m through complex London Clay and Lambeth Group geology. Seven drop shafts and two vortex drop structures manage hydraulic transitions. Real-time monitoring via fiber-optic distributed sensing ensures long-term asset performance.
Project Value
£1.1B
Tunnel Length
6.9 km
Tunnel Diameter
7.2 m
British Tunnelling Society - Project of the Year 2024
NCE Tunnelling Awards - Large Project Winner